Here is the Di2 battery mount and cable port on the left chainstay. The port is barely large enough to get the zip ties through. It is 7mm x 8mm, the Shimano requirement, but I might have to go to 7mm x 9mm to accommodate for paint millage. Don't want to chip it.
An old Cinelli brake bridge and a new Paragon that we will use on Dans frame. Uncut and undrilled, the Paragon is 10 gms. lighter while retaining the traditional look of the Cinelli. Chasing those grams!
Monday, May 16, 2011
Friday, May 13, 2011
The blogger is finally back on line. This is the pic I took this morning. With the exception of the brake bridge, the frame is completely brazed, weighing in at 3lbs. 13 oz. Since this photo, I have been working on the shore lines and smoothing out the lugs and bottom bracket. These new pieces from Dazza have more surface irregularities than his other lines and require considerable more filing and sanding. They are beautiful though and worth the extra effort.
Wednesday, May 11, 2011
After some birthdays, Mothers day, and other social obligations, I'll be able to get back to work on Dans frame. All the braze-ons are on. Here is the battery mount and cable port. The hole still needs to be enlarged to 8mm to allow the zip ties to pass through. Also, I will go over every edge inside the bottom bracket with detail files and sand paper to ensure there are no sharp edges to catch the wiring on.
Thursday, May 5, 2011
Tuesday, May 3, 2011
Mitered, cleaned, sanded, fuxed, and ready to braze. After brazing, I will do a preliminary polish on the dropouts as it's easier when they have the chainstay as a handle. I need to lace the Powertap/Zipp in the back ground this week. Anticipate brazing the chainstays to the front triangle on Thursday before Zimmys birthday party.
Subscribe to:
Posts (Atom)