Thursday, October 16, 2014

 The materials for Gregs frame are starting to arrive. Time to modify them.
Transferring the lower head tube lug pattern to the upper head tube lug.
 The rough cut is done. Now both lugs will have a symmetrical pattern while maintaining the 22 mm head tube extension.
The binder boss has been removed from the seat tube lug.
Ready to braze in a filler piece so I can create a point on the rear of the lug.

No comments:

Post a Comment