Friday, May 30, 2014

 Lots going on on Robins rain speeder.  Here, finishing up all the lug carving.
 Vent holes have been drilled.
 I removed 4 mm off of the new Paragon stainless water bottle bosses.  I don't care for blind holes and the bosses are a handy spot for shooting in an occasional shot of frame saver.

 And they are silver brazed in.
 Fitting up the stainless Di2 wire port reinforcements.
Done!
The front triangle is fixtured and ready for brazing.

No comments:

Post a Comment