Saturday, August 18, 2012

 Other than "day of brazing cold work and cleaning", the front triangle is ready.

I got a little side tracked on this frame.  It has a crack in the head tube that I can repair thanks to the cavernous head tube diameters.  I find that if I am diligent with the paint stripper dwell time and the scraping/wiping off, it cleans up quite nicely.  I think this will be a new flat bar single speed bar bike.

No comments:

Post a Comment