Rear point material added |
Dougs seat tube lug
and shamrock start.
Front point ready to braze |
Some rough shaping |
Areas marked for removal |
Assembled on the frame. With the exception of the vent holes, braze-ons and Shamrock, it's ready to braze. |
The shamrock layout |
Some rough shaping. I'm waiting for a set of small needle files to finish it with. |
No comments:
Post a Comment