Thursday, December 8, 2011

Tinas front triangle is in the tacking fixture and ready to braze.  Except, due to my poor inventory controls, I'm out of water bottle boss braze-ons.  So now it will sit until new stock arrives.  Here is the heart I cut into her bottom bracket and the reshaped point.
Well, I couldn't let this day go to waste, so I'm back to work on the interior routing for the shift cables on the fillet brazed frame.  The rear is a slam dunk, but I will still need the PF30 adapter for the front.

1 comment:

  1. Looks great Neil. Looking forward to seeing these frames develop!

    ReplyDelete