Saturday, August 29, 2009
Friday, August 28, 2009
Hard to do the scallops. The threaded boss precludes using files and not much room for a rotary tool. I'm thinking hours of tiny pieces of emery paper.
Thursday, August 27, 2009
Alas and alack(sp), life got in the way yesterday and the brazing was put off until today. Yeah, the job, all 24 hours a week of it gets in the way. Sweet Tina has assured me I get all day tomorrow for a "frame day". This morning, I spent some time pre-fitting the seat stays. I like. Devo, do you have a preference as to spacing of the stays at the seat tube? Like Dylans or directly behind the seat tube lug?
Wednesday, August 26, 2009
This shot is a mock up of the chain stay-dropout alignment with the 65mm BB drop and 433mm chain stay length. You can see that the axle setting screws(not installed) will just clear the top of the chain stay. I have seen frames where the chain stay is pinched for clearance and it's not pretty. Tina has a wine thing in Hood River this afternoon, so if the frame building fairies are good to me, I will get the chain stays and dropouts brazed in this afternoon.
Tuesday, August 25, 2009
Sunday, August 23, 2009
Here's a couple of shots of the almost finished
hand cut miters. Didn't want you to think there
was ugliness under the lugs.
The front triangle is ready to be cleaned, a little cold setting of the points, sanded, and silver brazed starting Monday. Devo told me to stick to the facts, so I won't elaborate on how I got the time to finish the triangle.
Friday, August 21, 2009
Subscribe to:
Posts (Atom)