Friday, July 13, 2012
Making ports for the internal wiring. I think this position is the cleanest looking as the wire can follow the front brake cable to the handle bars.
I shape and sweat the stainless steel washer on first and then drill and polish the hole and washer face together. I believe you have fewer stress issues that way.

And here is for the front derailleur. Thanks to Mr. English.
I wanted to post a couple of pics on the repaint. But the Pearl White is so reflective it over powers the powder blue lug lining. Even in the shade.
I shape and sweat the stainless steel washer on first and then drill and polish the hole and washer face together. I believe you have fewer stress issues that way.
And here is for the front derailleur. Thanks to Mr. English.
I wanted to post a couple of pics on the repaint. But the Pearl White is so reflective it over powers the powder blue lug lining. Even in the shade.
Friday, June 29, 2012
Here is Dylans frame after etch and sanding prime. Just a few little spots to glaze before the bright blue goes on. I'll force cure it in the oven while Tina is at work, to speed up the process. Unfortunately, my business credit card was hacked, so I hope I have enough paint. Time to start removing the paint on my frame.
Thursday, June 28, 2012
The rain bike frame goes back on the shelf for a bit. Instead, I'm doing a repaint on Dylan's original CERNITZ cross bike. At the same time, I'm going to convert my personal frame, that has been hanging in the Bikebar for ages, to Di2 and a repaint. After adding water bottle bosses, I had Dylans frame commercially stripped. While it was convenient, the two 70 mile round trips and 2 week lead time was more than I can take. I will hand strip my frame in less than two weeks with out any driving.
Subscribe to:
Posts (Atom)